Client: Antique Ceramics
Product Application: Ceramic Kiln Exhaust to Dryer Air Pre-heater
Location: Morbi, Gujarat, India
Date of Installation: 2008
Why Econotherm Heat Pipe Technology?:
Working Fluid: Distilled water
Access Panels: Yes
Automated Cleaning: Yes
Project Cost: 59,000 GBP
ROI Period: 6 months
Product Application: Ceramic Kiln Exhaust to Dryer Air Pre-heater
Location: Morbi, Gujarat, India
Date of Installation: 2008
The Challenge:
Exhaust Inlet: 316°C
Exhaust Mass Flow: 9800 Kg/h
Recovery Media Inlet: 35°C
Recovery Media Mass Flow: 12000 Kg/h
Fuel Type: Gas
The Client:
Much of India’s ceramics industry is located in Morbi, Gujarat; an estimated 75% of all India’s tile output is said to derive from this one region. Antique Ceramics is one of circa 300 local factories operating in a highly competitive sector both nationally in India and globally. Any competitive advantage that can be derived may make the difference between profitability and survival or loss making and potential closure.
Project Circumstances:
The technology used by Antique Ceramics (and many of their competitors) is roller kiln whereby the tiles are pressed as they pass through. The kilns contain multiple burners that generate a known waste heat but is largely considered unusable due to the aggressive dust particulate with high sulphur content. Several attempts had been made with conventional heat exchange technologies but none had been successful prior to the installation of the Econotherm unit.
Econotherm waste heat recovery technology proved ideal for Anrique Ceramic’s needs for a number of reasons:
- Econotherm heat pipe technology was sufficiently robust and reliable to withstand the aggressive particulate in the exhaust
- An automatic cleaning system was incorporated that enabled continuous operation without need for frequent maintenance stoppages
- Avoidance of corrosion due to isothermal properties and heat pipe temperatures higher than dew-point
The Solution: Carbon Steel Heat Pipes Unit
Configuration: Cross-Flow
Working Fluid: Distilled water
Access Panels: Yes
Automated Cleaning: Yes
Project Cost: 59,000 GBP
ROI Period: 6 months
Factors of Success:
In addition to the long-term reliability and robustness of the Econotherm unit the ability to clean and maintain the performance of the unit without disrupting the manufacturing process were critical to the clients’ needs and expectations.
Client / Project Feedback
Following the installation and commissioning of this unit Econotherm have received a performance certificate from the client testifying that the Econotherm unit has delivered on expectations in terms of recovering waste heat energy in extremely challenging circumstances.